Contact
Find the right NKT contacts for your region here.

NKT completes repair work on Gemini Wind Park connection

Sep 23, 2024

Gemini Wind Park, one of the largest offshore wind parks in the Netherlands, is once again fully operational after a failure in one of the export cables between the wind park and the shore. A group of cable and energy specialists, including a repair team from NKT, helped Gemini Wind Park with a fast repair during the summer. The NKT team was responsible for the jointing of the replacement cable between the windfarm and the coast.

High voltage cable installation offshore
Around 900,000 households are powered by sustainable energy from the Gemini Wind Park. This summer, the wind farm experienced a cable failure in one of the export cables between the wind park and the shore in the Netherlands. Cable downtime can be costly and significantly lowers the output from the wind farm.
Quickly a repair team was assembled, and the NKT team led the jointing of the replacement cable between the wind farm and the Groningen coast.
“NKT is pleased to have contributed to the swift repair of the Gemini connection, bringing the wind park back to full operational capacity and supplying sustainable energy to households across the Netherlands. Restoring a subsea connection is a complex operation that requires significant skills and expertise. We greatly appreciated the strong collaboration with the Gemini team on the job execution,” says Axel Barnekow Widmark, Executive Vice President, Service & Installation at NKT.
NKT offers a variety of lifecycle on- and offshore cable services, including repair preparedness, resources on call, fault location and on- and offshore repairs.
Christoffer Hellmann
Lead Communications Advisor
Christoffer_Hellmann_NKT (1).jpg

Follow us

Fair, sustainable - and accountable
  • Image of europacable logo
  • Image of ecovadis logo
  • Image of Endorser Logo
  • 01_Copper Mark_logo_RGB_Primary.png
Loading...