Contact
Find the right NKT contacts for your region here.
cable laying for Dogger Farm project

Dogger Bank Wind Farm, UK

NKT supports developers of Dogger Bank Wind Farm in enabling green supply to 6 million UK households

Key Facts

Client:

Dogger Bank Wind Farm

Location of the project:

The North Sea

Quantity of order:

Three turnkey 320 kV HVDC offshore and onshore power cable systems with a capacity of 1200 MW each.

Total route length:

680 km (205 km for phase A and B, 270 km for phase C)

Duration:

2019 – ongoing Planned commissioning steps in 2024, 2025 and 2026

Scope

cable laying for Dogger Farm project
Cable laying offshore cable
Barge loading
Cable drums ready for boarding
Cable laying offshore wind project

The project

Securing power transmission from UK´s first high-voltage direct current (DC) connected wind farm

The solution

NKT manufacture all cable systems needed and install them using our cable-laying vessel NKT Victoria.

Sustainability

NKT produces world’s first HVDC power cables using low-carbon copper

The initiative will reduce the carbon footprint of the HVDC power cables by more than 35 % and is part of NKT’s ambition to become a net-zero emissions company no later than 2050.
Read more
copper coil close up

Follow us

Fair, sustainable - and accountable
  • Image of europacable logo
  • Image of ecovadis logo
  • Image of Endorser Logo
  • 01_Copper Mark_logo_RGB_Primary.png
Loading...