Suggested Pages
Qaddy® is now available with halogen-free flextube wire. Flexible tubes with pre-wired conductors can be used for both open and closed installations and can be embedded in concrete.
https://www.nkt.com/references/flextube-with-wire-now-on-qaddy
Underground tunnel project for 400 kV cables to optimize enery supply for southern London - 30 km total length
https://www.nkt.com/references/beddington-london-united-kingdom
220/33 kV substation for steel plant - 40.5 km total length
https://www.nkt.com/references/al-hadeed-bahrain
30 kV in-field and 150 kV export cables for Germany's first commercial windfarm - 80 km total length
https://www.nkt.com/references/baltic-1-germany
Using 220 kV submarine and onshore cables cables to connect Glanagow and Raffeen via a busy shipping route - 30.5 km total length
https://www.nkt.com/references/cork-habour-ireland
Turnkey project for 380 kV cable system for TenneT TSO - 132 km total length
https://www.nkt.com/references/randstad380-netherlands
Successfully completed a vital and complex project to improve electrical transmission in the Auckland area.
https://www.nkt.com/references/naan-new-zealand
Turnkey solution including planning, material production, installation and testing for a wind farm in the German North Sea - 51 km total length
https://www.nkt.com/references/riffgat-germany
400 kV High Voltage underground project - 80 km total length
https://www.nkt.com/references/afrati-avlida-greece
Qaddy® is an integrated cable reel, pay-off and drum trolley, which significantly improves working conditions for electricians with its revolutionary ergonomic design.
https://www.nkt.com/references/safe-working-environment-with-qaddy
The turnkey solution comprised the longest HVAC submarine cable in the world at this time installed in one complete length and at this voltage.
https://www.nkt.com/references/gjoea-norway
The national power grids between Denmark and Norway are connected through four DC-links crossing the Skagerrak strait, capable to carrying 1700 MW of renewable energy to the two countries’ energy mix. One of the cables, the Skagerrak 2, was damaged due to external impact.
https://www.nkt.com/references/skagerrak-2-repair-norway-denmark
Products & Solutions
About NKT
Your career
Contact us
Report your concern
© NKT A/S